analyze_project_risks
Run AI risk analysis on one project and merge the findings into its risk register (visible via list_risks). A finding that matches an open AI risk nobody has touched updates it; one matching a risk a person or agent added or edited, or a dismissed risk, is skipped; the rest are added. Nothing is removed. Use this when the user asks "what could go wrong on Project X" or before a sprint planning meeting. Caller needs write access to the project, as for create_risk.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"projectId": "<projectId>"
},
"name": "analyze_project_risks"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| projectId | Yes |