Is this job notifiable under Part P?
check_part_pAnswers whether domestic electrical work in England or Wales must be notified to building control under Part P of the Building Regulations, with the reason and what to do next (self-certify through a competent person scheme within 30 days, or tell building control before starting). England and Wales differ: in Wales kitchens and outdoor areas are still special locations. Returns notifiable (true or false), answer, reason, what_to_do, must_check and sources. Scotland and Northern Ireland return not_covered. Example: adding a socket in a kitchen in England: {"nation":"england","work":"add_to_or_alter_existing_circuit","locations":["kitchen"]}.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"nation": "<nation>",
"work": "<work>"
},
"name": "check_part_p"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| work | Yes | The kind of work. Pick the most significant if the job has several parts (a new circuit outranks everything). | |
| trade | No | Optional. The electrician's own business details (Nero Trade Profile v1). Used to prefill certificate contractor fields and to give a stable nero_trade_ref. Not stored by Spark Pack. | |
| nation | Yes | Where the property is. | |
| building | No | Defaults to dwelling. | |
| locations | No | Where the work is. bath_or_shower_zone means within the zoned space around a bath or shower. Defaults to ["elsewhere"]. | |
| registered_with_competent_person_scheme | No | Whether the electrician is registered with a scheme such as NICEIC or NAPIT. Changes the next steps. |