Awaab's Law timescales checker (S.I. 2025/1042)
check_awaabs_law_timescalesChecks a social landlord's Awaab's Law timescales in England (section 10A of the Landlord and Tenant Act 1985 and the Hazards in Social Housing (Prescribed Requirements) (England) Regulations 2025, S.I. 2025/1042, in force from 27 October 2025 for damp and mould and for emergency hazards): the investigation, the written summary, the safety work, alternative accommodation and supplementary preventative work, each with its deadline and whether it was met, counting working days or 24-hour periods. It does not decide whether a hazard is significant or an emergency: that is a question of fact. Give the hazard, the timescale (track) and the date the landlord became aware; add later dates to check each step.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| alt | No | Alternative accommodation: "none" recorded (default), "provided", or "refused" (the tenant refused an offer). | |
| asAt | No | Check as at this date (defaults to today) (YYYY-MM-DD). | |
| aware | Yes | The date the landlord became aware of the issue (a report, complaint, inspection or letter of claim) (YYYY-MM-DD). | |
| track | Yes | "significant" (working days, default) or "emergency" (24 hours). | |
| hazard | Yes | The hazard: "damp" (Damp, mould or fungal growth), "excess-cold" (Excess cold), "excess-heat" (Excess heat), "hygiene" (Domestic hygiene, including food, pests, waste and sanitation), "falls-level" (Falls on the level, including baths and showers), "falls-stairs" (Falls on stairs, steps or ramps), "falls-between" (Falls between levels), "electrical" (Electrical hazards), "fire" (Fire and smoke), "explosion" (Explosions), "collapse" (Structural collapse or falling elements), "other" (Another housing hazard (e.g. water supply, carbon monoxide or gas, intruders)), "crowding" (Crowding and space). | |
| prevBy | No | Which investigation identified the preventative work: "first" (and it could begin at once), "first-wait" (it needed the further investigation first) or "further". | |
| altDate | No | Where provided: the date alternative accommodation was provided from (YYYY-MM-DD). | |
| altTime | No | Where provided: the time (24-hour HH:MM). Leave out if not known. | |
| further | No | The date the further investigation was completed (YYYY-MM-DD). | |
| outcome | No | What the latest investigation found: "none" (no significant or emergency hazard), "significant", "emergency", or "further" (a hazard, but a further investigation was needed). | |
| renewed | No | A renewed investigation (reg 7): the date it was completed (YYYY-MM-DD). | |
| landlord | No | "social" for a council or housing association (default), "private" or "other". Awaab's Law covers social housing. | |
| safetyBy | No | Where outcome is "further": which investigation identified the safety work. | |
| summary1 | No | The date the written summary was given after the first investigation (handed over, posted or emailed) (YYYY-MM-DD). | |
| summary2 | No | The date the written summary was given after the renewed investigation (YYYY-MM-DD). | |
| summary3 | No | The date the written summary was given after the further investigation (YYYY-MM-DD). | |
| awareTime | No | Emergency: the time the landlord became aware (24-hour HH:MM). Leave out if not known. | |
| workBegan | No | The date the preventative work began (YYYY-MM-DD). | |
| knewBefore | No | The landlord knew of the problem before the regulations applied to it (reg 21). | |
| safetyDone | No | The date the safety work was completed (YYYY-MM-DD). | |
| stepsTaken | No | The date steps were taken to arrange the preventative work (e.g. a contractor booked) (YYYY-MM-DD). | |
| adviceGiven | No | The date a safety advice document was given (optional) (YYYY-MM-DD). | |
| furtherTime | No | The time the further investigation was completed (24-hour HH:MM). Leave out if not known. | |
| groundsDate | No | Where groundsLater: when the grounds arose (YYYY-MM-DD). | |
| groundsTime | No | Where groundsLater: the time the grounds arose (24-hour HH:MM). Leave out if not known. | |
| renewedTime | No | The time the renewed investigation was completed (24-hour HH:MM). Leave out if not known. | |
| fireLocation | No | For a fire hazard: "inside" (inside a flat, or anywhere in a house) or "block" (a building with two or more homes: its structure, external walls, common parts or a flat's front door). | |
| firstOutcome | No | Where there was a renewed investigation: what the first one found, "none" or "significant". | |
| groundsLater | No | Emergency: reasonable grounds to believe there was an emergency arose later than awareness. | |
| investigated | No | The date the investigation (or emergency investigation) was completed (YYYY-MM-DD). | |
| preventative | No | Whether supplementary preventative work was identified (reg 13): "yes", "no" or "" if not known. | |
| furtherHazard | No | Where outcome is "further": the hazard found. | |
| workCompleted | No | The date the preventative work was completed (YYYY-MM-DD). | |
| safetyDoneTime | No | Emergency: the time the safety work was completed (24-hour HH:MM). Leave out if not known. | |
| askedInspection | No | The tenant asked for a physical inspection. | |
| firstWasPhysical | No | Whether the first investigation included a physical inspection: "yes", "no" or "" if not known. | |
| investigatedTime | No | Emergency: the time the investigation was completed (24-hour HH:MM). Leave out if not known. | |
| inspectionRequested | No | Where askedInspection: the date of the request (YYYY-MM-DD). |