Skip to main content
Glama

List the electricity prices of Georgia

energy_list_prices
Read-onlyIdempotent

Returns three monthly electricity prices of Georgia from the Georgian National Energy and Water Supply Regulatory Commission (GNERC), in tetri per kWh: the weighted average price of balancing electricity, the guaranteed capacity fee, and the price of the deregulated power plants. Give a period of at most 60 months from 2015-01. With no input, it returns the last 12 published months. Data from GNERC.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "energy_list_prices"
  }
}

Input Schema

NameRequiredDescriptionDefault
toNoThe last month, YYYY-MM. Leave it empty for the newest published month.
fromNoThe first month, YYYY-MM, from 2015-01. Leave it empty for 11 months before to.

Output Schema

NameRequiredDescriptionDefault
unitYesThe unit of each price: tetri per kWh. 100 tetri are 1 lari.
as_ofYesThe instant at which GNERC last changed a price workbook, or at which the server read them, RFC 3339.
staleYesTrue when GNERC did not answer and the server returns data it read before.
monthsYesEach published month of the period, the oldest first.
sourceYesThe source of the data: Georgian National Energy and Water Supply Regulatory Commission (GNERC).
newest_monthYesThe newest month that GNERC published, YYYY-MM.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

A4.2/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint=true, idempotentHint=true, destructiveHint=false and openWorldHint=true, so safety is covered. The description adds genuinely useful behavior beyond that: the data source, the unit of measure, the historical start bound, the 60-month cap, and the default window when no arguments are supplied. It does not mention refresh cadence or rate limits, which keeps it off a 5.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Front-loaded with the resource and the three series, then the constraints and defaults; every sentence carries operational information. The closing "Data from GNERC." is redundant with the source already named in the first sentence, a minor waste.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

The tool is simple (two optional date parameters, no nesting), an output schema exists so return structure needn't be explained, and the description still covers units, source, series names, historical bound, span cap, and default window. Nothing an agent needs in order to call it correctly is missing.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so both `from` and `to` are already documented with format and defaults, making 3 the baseline. The description contributes one constraint the schema lacks — the maximum 60-month span — but otherwise restates the format and default behavior already present in the structured fields.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource ("Returns three monthly electricity prices of Georgia") and enumerates exactly which three series are returned: balancing price, guaranteed capacity fee, and deregulated plant price. Units (tetri per kWh) and the authoritative source (GNERC) are named, so an agent can distinguish this from siblings like energy_get_balance or fuel_get_prices without opening the schema.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives clear operating context: a maximum span of 60 months starting from 2015-01, and an explicit no-input default of the last 12 published months. It does not name an alternative tool or state when-not to use this one (e.g., versus energy_get_balance for a different energy dataset), so it falls short of full routing guidance.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.