Get the electricity grid of Georgia
energy_get_gridReturns the state of the electricity grid of Georgia from Georgian State Electrosystem (GSE), the operator of the transmission grid: the generation of the hydro, thermal, wind, and solar power plants, the total generation, the consumption, and the flow on the lines to each neighbor country, in MW, with the frequency in Hz. Each value is the average of 3 minutes. A positive flow is an import, a negative flow an export. Each value carries the quality code of GSE: only ACT is a measurement. Give a moment to read the grid at a time in the last 31 days. The names are in English. Data from GSE.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "energy_get_grid"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| moment | No | A moment in the last 31 days: 2026-11-16T13:00 for a time of Tbilisi, or RFC 3339 with an offset, for example 2026-11-16T09:00:00Z. Leave it empty for the newest grid state. |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| time | Yes | The time of the grid slot as GSE stamps it, RFC 3339 with +04:00. It can be before the moment of the request when GSE published no newer slot. | |
| as_of | Yes | The instant at which the server read the grid state, RFC 3339. | |
| flows | Yes | The flow on the lines to each country, in MW. A positive flow is an import. | |
| stale | Yes | True when GSE did not answer and the server returns a grid state it read before. | |
| source | Yes | The source of the data: Georgian State Electrosystem (GSE). | |
| values | Yes | The count of the values that GSE published for the slot. | |
| measured | Yes | The count of the values with the quality code ACT. | |
| frequency | No | The frequency of the grid at the minute of the slot. Absent when GSE published none. | |
| generation | Yes | The generation by type of power plant, in MW. | |
| net_import | Yes | The sum of every flow, in MW. A negative net import is an export. | |
| consumption | Yes | The consumption of Georgia, in MW. | |
| average_minutes | Yes | The length of the average of each power value, in minutes: 3. |