Skip to main content
Glama

Texas property tax protest deadline

rules_tx_property_tax_protest_deadline
Read-onlyIdempotent

Deadline to file a Texas property tax protest with the appraisal review board: the later of May 15 or 30 days after the notice of appraised value was delivered, rolled past weekends and Texas legal holidays, plus a conservative file-by date (the last business day on or before the unadjusted deadline). status says where as_of (default: today in US Central time; echoed in as_of) falls: not_yet_open before January 1 of the tax year, open from then through the deadline, passed after it; days_remaining counts the days to the deadline (null once passed), and once passed next_season gives the same rule for the next tax year (May 15 basis). notes says what the rule does not cover (late protests, other §41.44 deadlines, §25.25 corrections) and which sections to read. Returns the statute citations, the rule's verification status and a disclaimer. Information about a statutory deadline: not legal or tax advice and not a substitute for the advice of an attorney. Verification status: verified. The answer carries rule rules.tx.property_tax_protest_deadline@2 and the statutes it rests on.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "tax_year": "<tax_year>"
    },
    "name": "rules_tx_property_tax_protest_deadline"
  }
}

Input Schema

NameRequiredDescriptionDefault
as_ofNoDate the status is measured from, YYYY-MM-DD. Default: the current date in US Central time (America/Chicago), when the call is answered; pass it to fix the date (for a report, or for El Paso and Hudspeth counties, which keep Mountain time).
tax_yearYesTax year being protested, e.g. 2026.
notice_delivered_dateNoDate the appraisal district's notice of appraised value was delivered (Tax Code §25.19), YYYY-MM-DD. A mailed notice is presumed delivered on the day it was deposited in the mail (§1.07(c)). Omit if unknown (May 15 is then the only basis).

Schema Changelog

Changes observed during successful MCP inspections.

  1. Changed1 schema field changed
    • addedInput schema / properties / as_of
      Added value: +{
      +  "description": "Date the status is measured from, YYYY-MM-DD. Default: the current date in US Central time (America/Chicago), when the call is answered; pass it to fix the date (for a report, or for El Paso and Hudspeth counties, which keep Mountain time).",
      +  "format": "date",
      +  "pattern": "^(?:(?:\\d\\d[2468][048]|\\d\\d[13579][26]|\\d\\d0[48]|[02468][048]00|[13579][26]00)-02-29|\\d{4}-(?:(?:0[13578]|1[02])-(?:0[1-9]|[12]\\d|3[01])|(?:0[469]|11)-(?:0[1-9]|[12]\\d|30)|(?:02)-(?:0[1-9]|1\\d|2[0-8])))$",
      +  "type": "string"
      +}
  2. First observed

TDQS

A3.9/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnly, idempotent, non-open-world behavior, and the description adds substantial context on top: the status lifecycle (not_yet_open / open / passed), the null days_remaining after passage, the next_season fallback with its May 15 basis, and the returned statute citations, verification status and disclaimer. That is a full behavioral contract for a calculation tool with no output schema.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness3/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The core rule is front-loaded, but the body is a dense run of semicolon-chained clauses and the description repeats the as_of default already documented in the schema. The disclaimer is stated twice ('not legal or tax advice' appears in both the advice sentence and the 'Information about a statutory deadline' sentence), costing space without adding meaning.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With no output schema and a nontrivial statutory rule, the description does the work of explaining status, days_remaining, next_season, notes and the citation/verification payload, which is enough for an agent to call and interpret it. The remaining gap is the absence of any routing note versus the batch sibling, which matters for a catalog this size.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3; the description earns above baseline by explaining the actual effect of notice_delivered_date on the computed deadline (the 30-day branch versus the May 15-only basis) and by restating the as_of default in the context of status evaluation. It adds rule semantics the schema does not express, though it does not extend parameter details beyond what the schema already covers.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description names a specific resource (Texas property tax protest deadline with the appraisal review board) and a specific computation (later of May 15 or 30 days after notice delivery, rolled past weekends and Texas holidays). It does not distinguish itself from the batch sibling rules_tx_property_tax_protest_deadline_batch, so an agent must infer the difference from the name alone.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage context is implied rather than stated: the description explains the scenario the rule applies to and, via notes, what the rule does not cover (late protests, other §41.44 deadlines, §25.25 corrections). It never states when to call this tool instead of the batch variant or calc_critical_dates, leaving tool selection to inference.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.