Skip to main content
Glama

BGB (Germany)

law_process_run

Read-only

How a particular case will run, step by step (O-5, DECISION-0052): a log of {date, attempt?, facts?} is executed frame by frame, and the law of each frame is the law of ITS date. The answer says: which stages have been entered; which attempted transition produced NO legal effect (§164 — "the act was performed but did not take place"); which duties are violated and which time limits are running; what is available next and WHAT EXACTLY is missing for the rest. The names of transitions come from law_process. Stages entered means "was it ever entered", not "where it is now": the core 0.1 does not compute points of the current state.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
stepsYesthe log of the case: [{date, attempt?, time?, decisionTime?, knowledgeTime?, facts: [{predicate, args}]}]; on an attempted transition `time` is the instant of the event (ISO 8601 with an offset), and by it the bearer takes its place in the history §161.1 (DECISION-0156); the decision and knowledge axes of a frame come from the entry, else from the case, else from midnight UTC of the date; every frame names the axes it used and where they came from
packageYesthe instrument
instanceYeswhat is going through the procedure: the number of the lot, of the application, of the case
legalTimeNothe base date (YYYY-MM-DD); the date of a frame is set by the step itself
probeTimeNothe instant of a hypothetical attempt, used to work out the steps available on the last frame; without it the available steps are not computed — the tool does not invent time
procedureNothe procedure, where there is more than one

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

Score is being calculated.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.