Calculations Patch Calculation Material
calculations_patch_calculation_materialDestructive
Override the material on an existing calculation.
The new material_grade_id is resolved exactly the same way
POST /calculations resolves it on create, so the result is
consistent with the create-time logic.
The calculation isn't re-priced here — follow up with POST /run
if a re-quote is desired. The explicit two-step flow lets you review
the override before paying for another pipeline pass.
Input Schema
TableJSON Schema
| Name | Required | Description | Default |
|---|---|---|---|
| material_ref | No | Material reference (URN, Werkstoffnummer, or trade name) to resolve and link. Provide this or ``material_grade_id``. | |
| calculation_id | Yes | ||
| material_grade_id | No | UUID of the material grade to link. Provide this or ``material_ref``. |