Evaluate Utility Rates and Tariffs
evaluate_utility_and_tariffsReturns the serving electric utility, EIA-861 retail industrial and commercial rates, large-load tariff schedules, queue delay risks, and demand flexibility options for a utility, project, or location.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "evaluate_utility_and_tariffs"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| site | No | Project name, site name, city, county, or canonical ID (e.g. 'Stargate Abilene', 'Columbus, OH', 'Loudoun County, VA'). | |
| query | No | Utility name, project name, or tariff query (e.g. 'AEP Ohio large load tariff'). | |
| state | No | Two-letter US state postal code (e.g. 'VA', 'OH', 'TX', 'LA'). | |
| action | No | Optional action mode (e.g. 'rates_and_tariffs'). | |
| company | No | Company, developer, hyperscaler, or utility name, ticker, or organization ID (e.g. 'Microsoft', 'MSFT', 'QTS Data Centers', 'Dominion Energy'). | |
| iso_rto | No | Wholesale ISO/RTO region (e.g. 'PJM', 'ERCOT', 'MISO'). | |
| load_mw | No | Target peak electrical load in megawatts for rate modeling (default: 100). | |
| project | No | Project name, alias, canonical project ID, Map project ID, queue ID, or developer plus place (e.g. 'Stargate Abilene', 'Hyperion', 'AXP-US-LA-00003', 'QTS Atlanta'). | |
| site_id | No | Optional site identifier. | |
| latitude | No | Site latitude in decimal degrees WGS84 (e.g. 39.9612). | |
| location | No | City, county, or location to identify the serving utility (e.g. 'Columbus, OH'). | |
| longitude | No | Site longitude in decimal degrees WGS84 (e.g. -82.9988). | |
| target_mw | No | Alias for target electrical load in megawatts (e.g. 200). | |
| project_id | No | Optional project ID to evaluate its serving utility and tariffs (e.g. 'P003'). | |
| utility_id | No | EIA utility ID or AIxEnergy utility slug (e.g. 'dominion-energy-virginia'). | |
| load_factor | No | Assumed annual load factor between 0.10 and 1.00 (default: 0.85). | |
| flexible_pct | No | Percentage of load available for demand flexibility or curtailment (e.g. 10). | |
| project_name | No | Optional project name to resolve serving utility (e.g. 'Hyperion'). | |
| utility_name | No | Electric utility name (e.g. 'Dominion Energy Virginia', 'AEP Ohio', 'Oncor', 'Entergy Louisiana'). | |
| include_tariffs | No | Include EIA-861 retail rates and large-load tariff schedules. | |
| include_flexibility | No | Include utility demand flexibility opportunity and interruptible rider analysis. | |
| include_rto_balance | No | Include regional ISO/RTO capacity balance metrics. | |
| canonical_project_id | No | Optional canonical project ID (e.g. 'AXP-US-LA-00003'). | |
| include_interconnection | No | Include utility queue horizon and delivery risk dockets. |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| status | No | Execution status (OK, SUCCESS, RESOLVED, AMBIGUOUS_ENTITY, NOT_FOUND, ERROR). | |
| _provenance | Yes | ||
| using_project | No | Banner confirming the resolved project name, city, state, and canonical ID when a project was matched. | |
| next_useful_tools | No | Suggested follow-up MCP tools relevant to this result. | |
| rates_and_tariffs | No | ||
| canonical_project_id | No | Canonical AIxEnergy project identifier (e.g. 'AXP-US-LA-00003'). | |
| flexibility_opportunity | No | ||
| utility_interconnection | No |