Skip to main content
Glama

Check Trail Availability

check_trail_availability
Read-onlyIdempotent

Day-by-day permit availability for one trail, from today up to 119 days ahead (Madeira dates). Each day is open (start times left for visitors), full (sold out for visitors), started (today only: every start time has already begun, nothing is left to book today; not sold out), closed, no_times (no start times listed) or unknown (not checked yet), with permits left for visitors and when it was last checked. Use date for one day, or from and to for a range; the default is the next 7 days. For the start times of a day, use get_start_times.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
toNoLast day of a range (YYYY-MM-DD, a Madeira calendar date).
dateNoOne day (YYYY-MM-DD, a Madeira calendar date).
fromNoFirst day of a range (YYYY-MM-DD, a Madeira calendar date).
trailYesThe trail: its seo_slug from list_permit_trails (preferred), a code such as "PR 18", "PR18" or "PS PR1", or a name such as "Levada do Rei". Accents are ignored.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

Score is being calculated.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources