Check execution methodology (method statement, phasing, controls, safety PPSPS) of a scene (indicative)
cao_bim_methodologieAppelez quand vous devez VERIFIER LA METHODOLOGIE D'EXECUTION (preparation des travaux) : mode operatoire (ME-MODE-OPERATOIRE), phasage (ME-PHASAGE), controles/autocontroles (ME-CONTROLES), securite PPSPS (ME-SECURITE). scene : methodologie {mode_operatoire, phasage, controles, securite}. Indicatif — methodologie validee par l'entreprise signee prime. Lecture seule.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| scene | No | Scene CAO : methodologie {mode_operatoire, phasage, controles, securite} |