Post-construction cleaning estimate
get_post_construction_estimatePrice range for a post-construction cleaning (nettoyage fin de travaux / fin de chantier) in Paris/Île-de-France, same calculation as the estimator on menageparfait.fr: HT and TTC (VAT 20%).
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| urgent | No | Within 48 h, at a weekend or outside 7:00–20:00 | |
| windows | No | Windows inside and out | |
| premises | No | apartment | |
| condition | No | light = lightly soiled; standard = renovation; heavy = heavy works or new build | standard |
| surface_m2 | Yes | Floor area in m² | |
| rubble_removal | No | Light rubble removal | |
| floor_stripping | No | Cement film / floor stripping |