Skip to main content
Glama

Get funding overview

get_funding_overview
Read-onlyIdempotent

Foerderprojekte des Mandanten auf einen Blick: je Projekt Laufzeit, Hoechstbetrag fuer uns, bisher erhalten, offene Abrufe — und die naechsten Fristen ueber alle Projekte (Bericht/Antrag faellig, Zahlung erwartet), mit Tagen bis dahin. Erster Aufruf, wenn es um Zuwendungen, Grants oder Zahlungsanforderungen geht.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "get_funding_overview"
  }
}

Input Schema

NameRequiredDescriptionDefault
tage_vorausNoFristen bis so viele Tage voraus (Vorgabe 120)

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A3.9/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

The annotations already declare this as a safe read operation (readOnly, idempotent, closed-world, non-destructive), so the safety bar is low. The description adds something the annotations do not: it lists what the response contains, including cross-project deadlines with the number of days remaining. It does not mention ordering, empty states or how projects without deadlines are handled, which keeps it below a 5.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two sentences: the returned content is enumerated first, and the when-to-call guidance is placed last as a clear entry point. The field list is dense but each item carries meaning. Minor redundancy in 'mit Tagen bis dahin' against the deadline wording, but no filler.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

There is no output schema, so the description has to carry the return-value burden, and it does by enumerating the per-project figures and the cross-project deadline list. With the only parameter documented in the schema and safety covered by annotations, an agent has enough to call it. The absence of guidance on what to do after this first call is the one remaining gap.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100% and the single parameter tage_voraus is fully documented in the schema, including its default of 120. The description only implies the look-ahead horizon through 'naechsten Fristen ... mit Tagen bis dahin' and adds no format or boundary detail beyond the schema. A baseline 3 is appropriate.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description states a concrete resource (funding projects for the client) and enumerates the contents of the overview: runtime, maximum amount, amount received so far, open claims, and upcoming deadlines with days remaining. That is more specific than the title. It never names a sibling such as get_foerderprojekt or get_foerder_abruf_stand, so its differentiation is positional ('first call') rather than explicit.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The final sentence gives clear usage guidance: this is the entry point whenever the topic is subsidies, grants or payment requests. That is a real routing instruction rather than an implied one. It stops short of the top score because it names no alternative for narrower follow-ups, so the agent must infer when to move to the per-project or claim-specific tools.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources