Change action state
change_action_stateMove an action to another list, or claim or release it on a shared project; operation says which (see its values). defer needs type and date: start hides it until that day (a plain "defer until"), scheduled makes it an appointment that day; wait needs waiting_for. Trash is reversible with restore. To change its fields use update_action; to hand it to a connection delegate_action. On a shared project only its assignee moves it.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"id": "<id>",
"operation": "<operation>"
},
"name": "change_action_state"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| id | Yes | Action id from `list_items` or `search_items`. | |
| date | No | YYYY-MM-DD; required with defer. | |
| time | No | HH:MM; defer only; no time means all day. | |
| type | No | Required with defer. start: hidden until date (tickler), then Next Actions; scheduled: a calendar appointment on date. | |
| duration | No | Minutes; defer with type scheduled only; default 60 when time is set. | |
| operation | Yes | complete: done (a project's next backlog action moves up); uncomplete: back from Completed; trash: to Trash; restore: back from Trash; someday: to Someday/Maybe; archive: to Archived; today: onto the Today list; activate: from Someday to Next Actions (a project backlog action: `reorder_item` list=project_backlog position=0); defer: to a later date; undefer: clear its dates, back to Next Actions; undue: remove its deadline; wait: to Waiting For; unwait: back from Waiting For; assign: claim a backlog action of a shared project; unassign: give your claim back to the backlog. | |
| add_to_top | No | true: top of the destination list; default false. | |
| waiting_for | No | Who or what you wait on; required with wait. |