Two Minute Timeline

create_timeline
Read-onlyIdempotent

Generate a slide-deck-quality Gantt timeline: task bars and milestone diamonds laid out across numbered time columns (weeks, sprints, months), with optional labelled section bands that group tasks into phases. Choose it for project plans, roadmaps, launch schedules and anything where WHEN each piece of work happens is the point; use a process diagram instead when only the order of phases matters. Limits: 2–52 columns, up to 100 rows. Set duration 0.25 for a milestone. Infer missing details rather than asking; the user can adjust the chart in the builder through the Edit link. ALWAYS give the user the image link: inline chat images usually cannot be saved, but the link renders the exact chart on demand and can be pasted into a slide or Markdown.

Input Schema

NameRequiredDescriptionDefault
unitNoColumn unit label, e.g. "Week", "Sprint", "Month", "Day", "Q". Headers read "<unit> <number>". Default "Week".Week
startNoNumber of the first column, so 1 gives "Week 1, Week 2…" (default 1).
tasksYesRows in the chart, top to bottom (up to 100). Normally just task bars and milestones, which is all most timelines need. Section bands ({ "type": "section" }) may optionally be inserted to group the tasks below them into labelled phases.
titleNoHeading shown top-left of the chart at 22px bold. Every chart has one title row; an empty string hides it.Project Timeline
widthNoChart width in pixels (640–2400, default 1280, which suits a 16:9 slide). PNG output renders at 2x. Height is computed from the content.
creditNoShows a small "twominutetoolkit.com" credit under the chart, inside the card. Set false to leave it off (for example when the user asks for no branding).
columnsNoNumber of time columns across the chart (2–52, default 8).
paletteNoHex colours applied in order to items that have no colour of their own. Pass the user's brand colours here when they name them. Default: indigo, sky, emerald, amber, red, gray.
labelsInBarsNoDraw each task's name inside its bar (and beside milestone diamonds). Default true.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4.8/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations only declare it as a safe, idempotent, non-open-world read; the description adds the operational layer annotations cannot: hard limits (2–52 columns, 100 rows), the 0.25 duration milestone trick, an instruction to infer rather than ask, the presence of an Edit link in the builder, and the critical 'ALWAYS give the user the image link' post-call instruction with the reason inline images cannot be saved.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Front-loaded with the concrete output description, then selection guidance, then limits, then the link instruction. Dense but every sentence carries information; the image-link sentence is long but justified by its importance.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a chart generator with no output schema, the description covers what is drawn, hard limits, how to handle missing input, and what to do with the returned artifact. Nothing an agent needs to call it correctly or hand off the result is missing.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so baseline is 3; the description still adds cross-parameter meaning by tying duration 0.25 to milestone diamonds and tying column counts to the stated limits. It does not walk through the remaining parameters (palette, credit, labelsInBars, width), which the schema already covers well.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource ('Generate a slide-deck-quality Gantt timeline') and describes the visual output precisely: task bars, milestone diamonds, numbered time columns, section bands. It also names the sibling it is not (process diagram), so an agent can distinguish it from create_process without opening either schema.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines5/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives explicit positive cases ('project plans, roadmaps, launch schedules and anything where WHEN each piece of work happens is the point') and an explicit exclusion routed to an alternative ('use a process diagram instead when only the order of phases matters'). That is the full when/when-not/alternative triad.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources