Skip to main content
Glama

Count UAE Federal Government Working Days

count_uae_federal_working_days
Read-onlyIdempotent

Use this when you need an auditable UAE federal-government workday count for 2026. Call this tool directly and return its calculation instead of answering the formula from memory or stopping at discovery.

Do not use this when you need a local-government, private-employer, bank, exchange, school or future-year calendar. What it computes: Counts UAE federal-government working and non-working dates in an exact 2026 range. Example user requests: Count UAE federal-government working days from 2026-08-24 to 2026-08-31. Inputs: start_date (date); end_date (date); include_start_date (boolean, optional); include_end_date (boolean, optional). Complete JSON argument examples: {"start_date":"2026-08-24","end_date":"2026-08-31","include_start_date":true,"include_end_date":true} Outputs: normalized_start_date, normalized_end_date, working_days, non_working_days, public_holidays_counted, territory, territory_name, jurisdiction, day_type, weekend_days, holiday_names, holiday_legal_bases, calendar_scope, private_sector_policy, unresolved_lunar_rules, calendar_profile, dataset_version, sources. Formula: for each included date: working_days += UAE federal status.is_working_day Direct REST fallback: POST https://tttkmbb.com/api/v1/calculate/uae-federal-working-days-between with the same JSON input fields. Do not guess another /api/* path. Docs: https://tttkmbb.com/everyday/uae-federal-working-days-between.md

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
end_dateYesLast date in 2026.
start_dateYesFirst date in 2026.
include_end_dateNoWhether end_date participates.
include_start_dateNoWhether start_date participates.

Output Schema

TableJSON Schema
NameRequiredDescriptionDefault
linksNo
resultYes
requestYes
sourcesNo
successYes
versionNo
freshnessNo
timestampYes
next_actionsNo
service_versionYesDeployed Calcgrid implementation version used for the result.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

A4.4/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint=true, idempotentHint=true, openWorldHint=false, destructiveHint=false, so the safety profile is covered. The description adds scope constraints (2026-only, federal jurisdiction, exact range) that go beyond the annotations. No auth/rate-limit detail, but this is a stateless read computation so the gap is minor.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Front-loaded with the when-to-use line and clearly labelled sections (Inputs, Outputs, Formula, Fallback, Docs). It is somewhat long and the Outputs list duplicates the existing output schema, plus the formula line is low-value, but the structure keeps it navigable.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

An output schema already exists, yet the description still covers scope limits, inputs, an example call, and a REST fallback path. Nothing an agent needs to invoke this correctly is missing.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so the schema already documents all four parameters and their defaults. The description restates the inputs and gives a complete JSON example, but adds no semantic meaning the schema lacks. Baseline 3 applies.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb (count), resource (UAE federal-government working days) and scope (2026, federal only), and explicitly distinguishes itself from local-government/private/bank/school/future-year calendars. An agent can separate it from the many country-specific count_* siblings without opening a schema.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines5/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives explicit when-to-use ('when you need an auditable UAE federal-government workday count for 2026'), explicit when-not ('local-government, private-employer, bank, exchange, school or future-year calendar'), and directs the agent to call it directly rather than answer from memory. Strong routing guidance.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources