Skip to main content
Glama

Update schedule

update_schedule
Destructive

Change a schedule in place: its time (cron_expression, or interval_value + interval_unit), the message each run starts with (prompt), its name, or what it runs (target_type + target_id). Give only what changes. It keeps its id, its history and whether it is on. Use this to move a schedule's time — never delete it and create another. To pause it, use pause_schedule; to turn it on again, turn_on_schedule.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "schedule_id": "<schedule_id>"
    },
    "name": "update_schedule"
  }
}

Input Schema

NameRequiredDescriptionDefault
nameNo
promptNoThe message each scheduled run starts with
timezoneNoThe timezone its cron is read in, as a name like America/New_York or Europe/Amsterdam: the one the person named, else their own. Leave it out for UTC
target_idNo
descriptionNo
schedule_idYes
target_typeNo
interval_unitNo
schedule_typeNo
interval_valueNo
cron_expressionNoStandard 5-field cron on the schedule's own clock (its timezone), never converted to UTC
missed_run_policyNoA time it missed (the machine was off): run it once as soon as it can, or skip it

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4.4/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Adds meaningful behavior beyond annotations: it is a partial in-place update ("Give only what changes"), preserves id/history/on-state, and is not a delete/recreate operation. It does not elaborate on the destructiveHint=true implications, such as overwriting an existing prompt or target, but the annotations already flag destructiveness.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Front-loads the core action, then gives field groups, partial-update semantics, state preservation, and alternatives. Every sentence earns its place with no filler.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a 12-parameter mutation tool with no output schema, it covers the main purpose, mutation style, and sibling routing well. It leaves some parameter-level detail and destructive-side-effect nuance to the schema and annotations, so it is strong but not fully complete.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

The description clarifies key parameter groups, especially time via cron_expression or interval_value + interval_unit, and target via target_type + target_id. With only 33% schema description coverage, it does not compensate for missing meaning on schedule_type, timezone, missed_run_policy, description, or the required schedule_id.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource, "Change a schedule in place," and enumerates the mutable areas: time, prompt, name, and target. It clearly distinguishes this from deleting/recreating and from pause_schedule/turn_on_schedule.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines5/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives explicit when-to-use guidance: use this to move a schedule's time, never delete it and create another. It also names the correct siblings for pausing and turning on, so the agent has clear routing alternatives.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.