Skip to main content
Glama

Close a sprint

close_sprints

Transition an ACTIVE sprint to CLOSED. Non-DONE tasks are carried over to the sprint id given in carry_over_to, or returned to the product backlog (sprint=null) if omitted. Each sprint carries app_url, a deep link straight to it in the ProWoDo web app — give it to the user instead of describing where to click.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
bodyNo
kwargsYes

TDQS

A4.2/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations indicate readOnly=false, but the description adds valuable context beyond that: it discloses the side effects on non-DONE tasks (carried over or returned to backlog) and the presence of app_url in the response. This enriches the behavior without contradicting annotations.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The description is two sentences, front-loaded with the core action, and provides essential behavioral and user-guidance details without waste. Every sentence carries meaningful information.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a simple mutation with one required parameter and no output schema, the description covers the main action, task handling, and a key response element (app_url). It does not mention errors or permissions, but given the annotations and simplicity, it is sufficiently complete.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

The schema already provides a thorough description for carry_over_to (including null handling), and pk is a generic primary key. The tool description mostly restates the carry_over_to semantics, adding little new parameter meaning. With schema coverage effectively high, a baseline score of 3 is appropriate.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description clearly states the tool's purpose with a specific verb and state change: "Transition an ACTIVE sprint to CLOSED." This distinguishes it from siblings like start_sprints, update_sprints, and list_sprints by focusing on the close action and the active-to-closed transition.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The description provides clear context for use: it explains the carry-over behavior for non-DONE tasks and instructs who should receive the app_url deep link. However, it does not explicitly compare with alternatives or state when not to use the tool, so it lacks explicit exclusions.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

TDQS

A3.6/5.0
Disambiguation4/5

Most tools are clearly scoped to a specific resource and action, but a few near-overlapping pairs (e.g., list_attachments vs list_taskattachments, create_tasktags vs add_tag_tasks) could cause misselection without close reading. Descriptions are detailed enough to resolve most ambiguity.

Naming Consistency4/5

The dominant verb_noun CRUD pattern (create_, list_, retrieve_, update_, partial_update_, destroy_) is consistent and predictable. However, non-standard pluralizations (companys, resumeentrys, taskdependencys) and a handful of irregular names (task_assign_user, move_relate_to_tasks) introduce minor inconsistencies.

Tool Count1/5

With 83 tools, this server is far beyond a well-scoped MCP surface, even for a feature-complete project management suite. The sheer volume will overwhelm agents and make selection inefficient, clearly falling into the extreme-mismatch range.

Completeness5/5

The toolset provides thorough lifecycle coverage across companies, projects, tasks, sprints, attachments, comments, dependencies, tags, reminders, resume entries, tickets, and users. Missing operations like company deletion or task-attachment creation appear intentional and are worked around via existing tools.

Resources