Estimate a base service cost
estimate_prepport_base_costEstimate public USD starting costs. Inspection: sampleChecks; prep: units; standalone pick-pack: orders. Storage: cubicMeters and either storageDays or months (30 days each), plus alreadyStoredDays when the batch is not new. The same batch gets 90 free days, not a new grace period. Yanwen parcel rates include standard pick-pack: do not add the standalone fee. Sourcing is quote-only. This does not quote, bill, purchase or ship.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"service": "<service>"
},
"name": "estimate_prepport_base_cost"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| units | No | ||
| months | No | Total planned duration in 30-day periods. Do not also provide storageDays. | |
| orders | No | ||
| service | Yes | Choose sourcing, inspection, prep, storage or fulfillment. | |
| cubicMeters | No | Estimated stored volume in CBM, up to three decimal places; not a warehouse measurement. | |
| storageDays | No | Planned additional storage days. Prefer days for precise free-period estimates. | |
| sampleChecks | No | ||
| alreadyStoredDays | No | Days already elapsed since actual receipt of this same batch. Defaults to zero for a new batch. |