Finance: Forecast variance
fin_forecast_varianceBudget against forecast for a period, and which side moved: the gap on income, on spend and on profit. Answers 'why is the November profit below what we planned'. Refuses the comparison outright when there is no approved budget, when the budget is in a different currency, or when the forecast could not be reduced to one currency — a missing rate must never be reported as agreement with the plan.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "fin_forecast_variance"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| period | No | Fiscal period id (see fin_periods). Default: the current month. |