ERP: Update assignment
erp_update_assignmentChange an existing assignment's title, description, priority or deadline. Only the fields passed are touched; the rest are left alone. To change who it is assigned to use erp_reassign_assignment, and to move it through its lifecycle use erp_set_assignment_status. CONFIRMATION: this tool is PROPOSED, never performed directly. You get status='confirmation_required' with an action_id and a plan_token, and the write happens only after confirm_action.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"assignment_id": "<assignment_id>",
"project_id": "<project_id>"
},
"name": "erp_update_assignment"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| title | No | ||
| deadline | No | ||
| priority | No | ||
| project_id | Yes | ||
| description | No | ||
| assignment_id | Yes |