ERP: Set assignment status
erp_set_assignment_statusMove one assignment through its lifecycle: New → Active → Completed, or aside to Postponed. 'Overdue' is not settable — the server derives it from the deadline. The ERP authorises this against the caller's own edit permission. CONFIRMATION: this tool is PROPOSED, never performed directly. You get status='confirmation_required' with an action_id and a plan_token, and the write happens only after confirm_action.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"assignment_id": "<assignment_id>",
"project_id": "<project_id>",
"status": "<status>"
},
"name": "erp_set_assignment_status"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| status | Yes | ||
| deadline | No | ||
| project_id | Yes | ||
| assignment_id | Yes |