ERP: Add checklist items
erp_add_checklist_itemsAdd one or more checklist points to an assignment. Pass them in the order they should appear; the server continues the task's existing numbering. Breaking a task into steps is usually several points at once, so this takes a list rather than one line per call. CONFIRMATION: this tool is PROPOSED, never performed directly. You get status='confirmation_required' with an action_id and a plan_token, and the write happens only after confirm_action.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"assignment_id": "<assignment_id>",
"project_id": "<project_id>",
"items": "<items>"
},
"name": "erp_add_checklist_items"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| items | Yes | ||
| project_id | Yes | ||
| assignment_id | Yes |