Skip to main content
Glama

goal-summary

Read-only

Aggregate statistics across all goals (or scoped to a projectId): total count, breakdown by status, root count, blocked count, and overdue count. Useful for daily standups and dashboard views.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
projectIdNoUUID проекта

TDQS

A4.2/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

With readOnlyHint=true, the safety profile is already covered. The description adds scoping behavior (all goals vs projectId) and the specific metrics computed, which is useful context. It does not mention performance or edge cases, but for a read-only summary tool this is acceptable.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two sentences with no redundant wording. The first sentence front-loads the action and specifics; the second gives a practical use case.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a simple read-only summary tool with one optional parameter and no output schema, the description covers the functional scope and statistics returned. It could mention the return format, but the listed metrics suffice for an agent to invoke it correctly.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

The schema covers projectId with a description, and the description clarifies that null includes all goals while a projectId scopes the aggregation. This adds behavioral meaning beyond the schema's syntactic description.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description clearly identifies the tool as an aggregation function over goals, listing specific metrics (total count, status breakdown, root count, blocked count, overdue count). This distinguishes it from sibling tools like goal-list and goal-get.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Provides a clear use case ('daily standups and dashboard views') and notes the optional projectId scoping, implying when it is useful. Does not explicitly exclude alternatives or name sibling tools, but the context is sufficient.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

TDQS

A3.9/5.0
Disambiguation4/5

Most tools have clear distinct purposes (goal-create vs goal-update vs goal-delete), but the evidence-related tools (goal-add-evidence-text, goal-attach-evidence, goal-request-upload) and note tools (goal-add-note) have overlapping concepts that require careful reading of descriptions to differentiate. Overall, the detailed descriptions help resolve ambiguity, but a few tools could be easily confused.

Naming Consistency4/5

The majority follow a consistent verb_noun pattern with a resource prefix (goal-create, goal-get, project-list, project-update). However, there are deviations like account-delete (noun-verb reversed), goal-todo, goal-summary, goal-tree, and goal-recent-unresolved that break the pattern. The inconsistency is minor but noticeable.

Tool Count2/5

With 38 tools, this server has a very large surface area. Even for a complex planner with evidence management, the number exceeds the 25-tool threshold for 'too many'. Many tools could potentially be consolidated (e.g., goal-add-note and goal-add-evidence-text), and the size may overwhelm agents during tool selection.

Completeness5/5

The tool set provides complete coverage of the domain: full goal lifecycle (create, get, update, delete, list, tree, move, reorder, block), evidence management (attach, request upload, text evidence, remove), acceptance criteria (add, update, remove, request change, resolve escalation), assumptions (add, update, remove, suggest, attach evidence), blockers, notes, project management (CRUD, dependencies), and configuration settings. No critical gaps are apparent.

Resources