Preview levelling
preview_levellingShow which tasks workload levelling would slide later so nobody is booked beyond their capacity, across every project of the workspace — without changing anything. Tasks keep their length. Administrator or ProjectManager. Show this to the user before apply_levelling.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| utcOffsetMinutes | No | The caller's UTC offset in minutes (e.g. 420 for UTC+7), so "this week" and "today" are the user's own (optional, default 0 = UTC) |