Prove savings: identified, signed, realised and what actually reached the budget or P&L, with the gaps in euros
track_valueAICTIONBOT™ savings proof by KULIC Advisory, built on the Execution Toolkit template T19 (procurement pipeline and value tracker). Takes the list of savings initiatives with identified, signed (contracted) and realised values and whether the saving reached the budget or P&L (yes, no or an amount), and returns the funnel totals, how many euros of every 100 identified arrive in the budget or P&L, the three gaps (not contracted, signed but not realised, realised but not booked), totals by category and owner, and flags per initiative (realised above contract, marked realised without amount, signed over six months ago with nothing realised, no owner, no baseline). German or English column names are recognised (Maßnahme, Warengruppe, Verantwortlich, Baseline, erkannt, unterschrieben, realisiert, in_budget, Vertragsdatum, Status). Deterministic, no AI, nothing stored. Needs sign-in: runs with an AICTIONBOT™ Werkbank licence; without a licence one check per connection every 30 days is free (sign in with “Connect without a licence”).
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"initiatives": "<initiatives>"
},
"name": "track_value"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| as_of | No | Reference date, YYYY-MM-DD. Default today. | |
| language | No | Language of the answer. Default de. | |
| initiatives | Yes | Initiative rows: initiative, category, owner, baseline, identified, signed, realised, in_budget (yes, no or amount), signed_date, stage. |