Switch-over check for a new system or a new supplier: dated checklist, readiness traffic light, gaps and a Q&A sheet for staff
check_switchoverAICTIONBOT™ switch-over check by KULIC Advisory (tool 42), built on the Execution Toolkit template T06 (implementation tracker). kind system (new ERP or purchasing system) or supplier (switch to a new supplier), name, go_live date. Without a list it returns a 12-point checklist dated from the go-live (data, open orders, roles and approvals, training, test, supplier information, cut-over, post-launch support; or contract and notice, supplier set-up, samples, open orders, stock, tools and moulds, first delivery, first rating). With the team's own list (item, area, owner, due, status) it rates readiness red, yellow or green, lists blocked and overdue items, items without owner or date, and checklist points missing from the list. Always adds questions and answers for staff. Deterministic, no AI, nothing stored. Needs sign-in: runs with an AICTIONBOT™ Werkbank licence; without a licence one check per connection every 30 days is free (sign in with “Connect without a licence”).
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "check_switchover"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| kind | No | system for a new system, supplier (lieferant) for a new supplier. Default system. | |
| name | No | What is being switched, e.g. new purchasing system. | |
| as_of | No | Reference date, YYYY-MM-DD. Default today. | |
| items | No | Optional own list: item, area, owner, due, status (open, in progress, done, blocked). | |
| go_live | No | Go-live date, YYYY-MM-DD or DD.MM.YYYY. | |
| language | No | Language of the answer. Default de. |