Skip to main content
Glama

Schedule social post

schedule_social_post
DestructiveIdempotent

Set, move or remove a post's date — 'schedule the autumn post for Friday 9 am'. The date appears in the SocialStudio calendar and in the BusinessCloud calendar. Nothing is posted: the user shares the post. Pass remove: true (without scheduled_at) to remove the date.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "post_id": "<post_id>"
    },
    "name": "schedule_social_post"
  }
}

Input Schema

NameRequiredDescriptionDefault
removeNotrue: remove the date instead of setting one.
post_idYesThe website's id — from list_sites.
campaignNoCampaign name, optional.
scheduled_atNoDate and time with zone, e.g. 2026-12-03T09:00:00+01:00.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

A4.2/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare destructiveHint=true and idempotentHint=true. The description adds valuable behavior beyond those fields: the date appears in two calendars, nothing is posted, and removal is done with remove: true without scheduled_at.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The description is short, front-loaded, and every sentence contributes useful information: the action, an example, calendar visibility, non-publishing behavior, and removal semantics.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a scheduling tool with full parameter descriptions and annotations, the description covers the core action, side effects, and removal behavior. The only minor gap is that the optional campaign parameter is not explained in the description itself.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so the parameters are already well documented. The description reinforces the remove/scheduled_at relationship, but it does not explain the optional campaign parameter and largely repeats schema-level meaning.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description states a specific verb and resource: 'Set, move or remove a post's date.' It clearly distinguishes date scheduling from publishing ('Nothing is posted: the user shares the post') and names the calendars where the date appears.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It gives clear usage context for setting, moving, or removing a post's date, including an example. It also explains that the tool does not publish the post, which helps distinguish it from posting actions, but it does not explicitly name alternatives or exclusions.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources