Append to a project’s history
append_project_historyAppends ONE line to a project's history: what changed, why it happened, and how it was checked. Append-only — older entries stay as written, and this is the record rather than the guide (save_memory is the guide). The session read carries the last five entries; the server keeps the newest 40 entries, 30 days and 6,000 characters, pruning the rest itself. Example: {"idempotency_key":"a1b2c3d4-history-append","project_id":"project_acme","entry":"Fixed the login redirect loop; verified against the live endpoint.","reason":"Record the outcome"}
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"project_id": "<project_id>",
"entry": "<entry>",
"idempotency_key": "<idempotency_key>"
},
"name": "append_project_history"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| entry | Yes | One line. At most 400 characters are kept: what changed, why, and how it was checked. | |
| reason | No | ||
| commits | No | The commits this call produced, for the receipt panel only. At most ten. | |
| project_id | Yes | ||
| confirmation_id | No | ||
| idempotency_key | Yes | ||
| confirmation_via | No |