get_project_alerts
Lists the risk alerts this workspace raised for the project on its own: overdue work, deadlines about to slip, tasks with no movement, no owner or no due date, people overloaded. Read-only, and the fastest way to answer "how is this project doing" with evidence instead of impression — the alerts were computed from the data, not from a summary you wrote.
Defaults to active alerts only. Each one carries type, severity, a human message, and the task it points at when it points at one.
Two things worth knowing. The list is filtered by what the token's role is allowed to see, so an empty result means "nothing you can see", not always "nothing exists". And you cannot resolve or dismiss an alert through this connector — that stays with a person in the UI, on purpose. Report what is open and let them decide.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| limit | No | ||
| status | No | ||
| severity | No | ||
| alertType | No | ||
| sinceDays | No | ||
| project_id | Yes | Project ID this call refers to. Omit it once to get the list of projects you can access. |