IBC test and inspection due dates
ibc_inspection_datesRead-onlyIdempotent
Work out an IBC's next leakproofness test, 2.5-year and 5-year inspections, the last month it may be filled and (UN/ADR, plastic and composite IBCs) the end of its five-year life. Dates as MM/YYYY, "March 2024" or YYYY-MM.
Input Schema
TableJSON Schema
| Name | Required | Description | Default |
|---|---|---|---|
| code | No | IBC code, e.g. 31HA1, if no mark | |
| insp | No | Month of the last inspection | |
| leak | No | Month of the last leakproofness test | |
| made | No | Month of manufacture | |
| mark | No | The IBC UN mark; code and month of manufacture are read from it | |
| regime | No | un (UN Model Regulations and ADR, default) or us (49 CFR 180.352) |