Skip to main content
Glama

Project Report

project_report
Read-onlyIdempotent

Reads a project's report: one document with each area's main figures over the last period_days (7 or 30; default 30), the report the page /app/projects/{id}/report shows and scheduled emails attach as a PDF. It is built only from data DataFluxor already holds and the project's own Search Console: it searches, buys and charges nothing. sections, in order: visibility (first: a 0-100 score from Search Console beside site health, why traffic is low, and searches at positions 11-100 to push up), health (the newest audit of the project's site: health score with its change since the previous audit on the same scale, errors, warnings, pages audited, recent audits), rankings (tracked keywords: in Google's top 10, average position, visibility, moved up/down, estimated visits, the biggest moves, and positions: each tracked keyword's place now and at the period start, change, ranking page and check date, best first, up to 500 rows (total counts all)), search_console (clicks, impressions, CTR and average position from the connected Search Console, against the period before, and the top searches), organic (DataForSEO's keywords and estimated visits for the site in one Google market, the newest stored month), backlinks (linking websites, backlinks, new and lost linking sites, the newest stored month), ai (AI visibility score, answers naming and linking the site, the searches checked) and alerts (open alerts). Each section has status ready (figures), not_set_up or no_data (a note says what to do, and no figure is made up) or unavailable (its source could not be read; the others still show), a path to its workspace page, figures (label, value, number, change, tone good/bad/neutral, help) and short tables. country and language choose the Google market of the organic figures; leave them out to use the first of United Kingdom and United States with stored figures. Free. Read-only.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "project_id": "<project_id>"
    },
    "name": "project_report"
  }
}

Input Schema

NameRequiredDescriptionDefault
countryNoTwo-letter country of the Google market for the organic figures (for example GB or US). Leave out for the first of GB and US with stored figures.
languageNoTwo-letter language of that market; default en.
verbosityNoconcise: short summary of the answer; full: the whole answer. Only shapes the output.
project_idYesProject ID, as listed by projects_list; it must belong to the authenticated organization.
period_daysNoThe period the report covers, in days up to today.
idempotency_keyNoOptional and ignored: this call never charges.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

A3.7/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already cover readOnly/idempotent/destructive/openWorld, yet the description still adds real behavior: it performs no searches or purchases and charges nothing, per-section status semantics (ready/not_set_up/no_data/unavailable), graceful degradation when one source fails, and an explicit no-fabricated-figures guarantee. The only gap is the row-limit/pagination behavior beyond 'up to 500 rows' in the rankings section.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness3/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The content is rich but delivered as one sprawling paragraph with a long inline 'sections, in order' enumeration, so it is dense rather than skimmable. The key constraints (free, read-only, no charges) are buried at the end rather than front-loaded, and the section inventory is heavier than most callers need before invoking.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With no output schema, the description carries the full return-value burden and does so thoroughly: it enumerates all nine sections, their figures, tables and ordering, and defines the status states and partial-failure behavior. An agent can predict the response shape and failure modes without a schema.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100% and every parameter is already documented there, so the baseline is 3. The description restates the same facts (period_days 7 or 30 with default 30, country/language fallback to the first of GB/US with stored figures), which confirms but does not meaningfully extend the schema's semantics.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

Opens with a specific verb and resource ('Reads a project's report: one document with each area's main figures') and scopes it as the aggregate view behind the /app/projects/{id}/report page and scheduled emails. That aggregate framing implicitly separates it from single-area siblings like project_rank_report or project_ai_visibility_report, but no sibling is ever named, so the differentiation is left to inference.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It gives context ('the report the page shows and scheduled emails attach as a PDF') and cost guidance ('Free. Read-only.'), which helps an agent pick it for a whole-project summary. However, there is no explicit when-to-use versus when-not, and no pointer to the per-area sibling tools for narrower requests, so the agent must infer the routing.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources