Level two to six quotes for one job, line by line
level_quotesLevels two to six contractors' quotes for one job against the job's own lines: per line, whether each includes it (its quantity against the job's range, both systems), leaves it out, excludes it or offers an alternative; what each adds; questions to ask. Money is taken out: no total, no ranking.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| job | Yes | The job the quotes are for: a quote check (bathroom-quote, plastering-quote, concrete-slab-quote …) or a takeoff id that has one. | |
| detail | No | full (the default): the whole answer. summary: the result lines, the citation line and the page only — fewer tokens to read. | full |
| market | No | Optional. A market whose own opening choice some inputs take (a UK reader's code, an IEC motor), and whose currency symbol prints the caller's own money figures. | |
| quotes | Yes | Two to six quotes for the same job. Money in them is taken out before reading. | |
| system | No | The unit system inputs left out open in, and the one the page link opens in. The answer comes in both. | metric |
| selection | No | Build-up choice id → option id, the takeoff's own (a stud size, an insulation, a cladding). Choices left out take the page's own for the system. | |
| inputUnits | No | Send "base" to pass bare numbers on dimensioned inputs in base units (m, m², L, kg …), as the published test vectors are written. Without it a length, area or volume must carry its unit. | |
| measurements | No | Measurement id → value, each length, area or volume with its unit ("12 ft", {"value": 3.6, "unit": "m"}); counts as numbers. Ids are those of the takeoff; any left out opens at the page's own figure. |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||