Estimated labour hours per line of a project
estimate_hoursEstimated person-hours on each line of a project, as My Project shows them: hours typed on the line, else a production rate's band for its quantity, else the reason for none; with the project's crew-days. From a token, a file, calculators, takeoffs or a drawing. Hours only: no prices.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| crew | No | People on site, for the crew-days. | |
| file | No | A My Project file (the backup a project-file answer returns, or one the reader exported): its active project's lines, with any hours and rates typed on them. | |
| name | No | The project's name. | |
| token | No | A project state token (cqp1.…) from a project-file answer or an update. | |
| detail | No | full (the default): the whole answer. summary: the result lines, the citation line and the page only — fewer tokens to read. | full |
| market | No | Optional. A market whose own opening choice some inputs take (a UK reader's code, an IEC motor), and whose currency symbol prints the caller's own money figures. | |
| system | No | The unit system inputs left out open in, and the one the page link opens in. The answer comes in both. | metric |
| drawing | No | A Construction Canvas drawing (a template, a house form, shapes, drawing commands or a canvas document), as a project file takes it. | |
| takeoffs | No | Whole-job takeoffs, each an id and its measurements, as a project file takes them. | |
| calculators | No | Calculator lines, each a slug and its inputs, as a project file takes them. | |
| hoursPerDay | No | Working hours in a day, for the crew-days. |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||