Compute Embankment Cross-Section BoQ
compute_embankment_cross_sectionPaid tier only. Calling this without an authenticated CivilQuants account returns TIER_INSUFFICIENT — sign up at https://civilquants.com/pricing or use the free-tier alternative compute_end_area_earthworks. Geometry-driven embankment per MMHW Series 600 — trapezoidal cross-section with crest width, asymmetric side slopes (h:v), and per-chainage height profile. Auto-generates the CrossSection series and delegates volume integration + mass-haul + standards routing to the end_area_earthworks engine, inheriting the four-standard rendering invariant. Auto-computes topsoil strip footprint from toe-to-toe envelope and supports an optional founding-strip excavation below ground level. Example params: crest_width_m=10 m (3–30), side_slope_h_per_v=2 (1–4), strip_envelope_offset_m=0.5 m (0–2). Example call: {"params": {"crest_width_m": 10, "side_slope_h_per_v": 2, "strip_envelope_offset_m": 0.5}, "standard": "MMHW"}. Omitted parameters use sensible engineering defaults. Pass deliverables=["xlsx","dxf","pdf"] (any subset) to also receive one-shot download URLs in the same call: Excel BoQ (both tiers, watermarked free) plus the dimensioned DXF (CAD) and PDF drawing sheets (paid tier).
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| params | Yes | Inputs for a geometry-driven embankment cross-section assembly. The assembly generates a `CrossSection` list from the profile + geometry parameters, builds an `EndAreaEarthworksParameters` from the result + the material/method parameters carried here, and delegates compute to `EndAreaEarthworks.compute(...)`. Per Session 12 Q2 decision: left and right slopes are exposed separately, both defaulting to `side_slope_h_per_v` so the common symmetric case is a single-parameter call. | |
| standard | No | MMHW | |
| output_mode | No | full_json | |
| deliverables | No |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| result | Yes |