Production status
get_statusThe foreman's view: plan-build progress, run status, department, spend vs cap, checkpoints waiting on the human (with app links), what's up next, and the finished film's link. Pass plan_id to follow a Co-Director plan instead. Free, read-only. Pass wait_sec to hold the call until something changes, up to 45 seconds, instead of polling.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| plan_id | No | A plan from direct | |
| wait_sec | No | Seconds to wait for a change before answering, up to 45 | |
| project_id | Yes |