Freight factoring true cost calculator
buscalc_freight_factoring_true_cost_calculatorFind the real cost of factoring one freight invoice as an annual rate, plus the cash you get now and the reserve released later. Use this tested BusCalc worksheet when the task matches its inputs and scope. Returns named results, units, formula, assumptions, method version, reference-value notes (official figure or your figure, with source and effective date), a check link and a source-page URL. Official reference values are prefilled when omitted; supply every other figure from the user's records. Percent fields take percent numbers. No figures are looked up; no private projects or purchases are accessed. Put tool fields inside inputs. Supply units or modelVersion only when listed in inputSchema. Follow its required fields and exact choices. Do not pass the REST calculator field inside MCP arguments.
Example tool call
This call uses example arguments supplied in the tool’s input schema.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"inputs": {
"ach": 10,
"days": 32,
"other": 0,
"advance": 95,
"flatFee": 3,
"invoice": 2500
}
},
"name": "buscalc_freight_factoring_true_cost_calculator"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| units | No | ||
| inputs | Yes | ||
| modelVersion | No | Optional expected method version; a mismatch is rejected. |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| rows | No | ||
| notes | No | Reference-value notes first, then model notes and the standard limit statement. | |
| title | No | ||
| units | No | ||
| inputs | Yes | ||
| columns | No | ||
| formula | No | ||
| receipt | Yes | ||
| results | Yes | ||
| sealURL | No | Where a saved record of this result can be sealed with an independent timestamp. | |
| checkURL | No | Link that replays this calculation on https://buscalc.com/sumtru/verify/. Null when the inputs hold free-form text or the link would be too long. | |
| currency | No | ||
| sourceURL | Yes | ||
| calculator | Yes | ||
| assumptions | No | ||
| modelVersion | Yes | ||
| referenceValues | No | One entry per official reference value in play: the official figure, the figure used, status official or user, source, effective date and the note text. |