Apply Timeline Split
timeline_split_applySplit one timeline item at the expected project revision. Changes existing timeline state and returns a retry-safe receipt.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"projectId": "<projectId>",
"expectedRevision": "<expectedRevision>",
"idempotencyKey": "<idempotencyKey>",
"timelineItemId": "<timelineItemId>",
"splitAtSeconds": "<splitAtSeconds>",
"snapToFrame": "<snapToFrame>"
},
"name": "timeline_split_apply"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| projectId | Yes | UUID string. | |
| snapToFrame | Yes | ||
| idempotencyKey | Yes | ||
| splitAtSeconds | Yes | ||
| timelineItemId | Yes | ||
| expectedRevision | Yes | Expected sequence revision, or null. |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||