Summary before sending a project
get_submission_summaryReturns the summary of sending a project checked with start_part_check to Fillio: files, analysis outcome, answers and those still missing, and, when nothing is missing, a time-limited confirmation that submit_part_check takes to send the project. Read-only: nothing is sent or saved. An answer left out takes the one already entered in the portal, if any. Useful to show the user what would be sent, before they decide to send their part. Requires the same connected Fillio account.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"project": "<project>"
},
"name": "get_submission_summary"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| lang | No | Language of the answer: “fr” or “en”. | |
| notes | No | Project notes for Fillio (optional). | |
| resin | No | Overmolding resin: polyamide, urethane, silicone or advise (Fillio's choice). Defaults to the one of the check. | |
| supply | No | Who supplies the components to overmold (cable, connectors, board): client (the user supplies them), fillio (Fillio sources them), mixed or unknown (to be discussed). | |
| project | Yes | Number of the checked project to send (DEM-…). | |
| quantity | No | First-batch quantity, prototypes included; a range is an answer. | |
| target_date | No | Target date for the first parts: a date, a month, “as soon as possible” or “to be determined”. | |
| annual_volume | No | Expected annual volume in production; a range or “to be determined” are answers. |