Real cost of in-house potting
estimate_in_house_potting_costReturns the real cost per working part of one year of in-house potting (epoxy or resin encapsulation), comparable with a quote: labour, engineering, rejects, returns, resin, curing space, equipment, health and safety, and delays. Same calculation as the calculator on www.fillio.ca; a missing argument takes the calculator's default value. Nothing is stored or sent.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "estimate_in_house_potting_cost"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| lang | No | Language of the answer: “fr” or “en”. | |
| weeks_added | No | Weeks added to the project (wk) | |
| assembly_value | No | Full value of one assembly ($) | |
| parts_per_year | No | Parts produced per year (parts) | |
| cost_per_return | No | Cost of one return ($) | |
| cure_time_hours | No | Cure time (h) | |
| resin_wasted_pct | No | Wasted or expired resin (%) | |
| equipment_per_year | No | Amortized equipment and upkeep ($/yr) | |
| rejected_parts_pct | No | Rejected parts (%) | |
| resin_cost_per_part | No | Resin per part ($) | |
| delay_value_per_week | No | Value of a one-week delay ($) | |
| parts_potted_per_day | No | Parts potted per day (parts) | |
| health_safety_per_year | No | Health and safety, waste, training ($/yr) | |
| operator_rate_per_hour | No | Loaded hourly rate, operator ($/h) | |
| space_cost_per_ft2_year | No | Annual cost of space ($/ft²) | |
| potting_minutes_per_part | No | Potting time per part (min) | |
| customer_returns_per_year | No | Customer returns per year (returns) | |
| engineering_rate_per_hour | No | Loaded hourly rate, engineering ($/h) | |
| engineering_hours_per_month | No | Engineering hours on potting (h/month) | |
| floor_space_per_curing_part_ft2 | No | Floor space per curing part (ft²) |