List infrastructure asset costs
list_infrastructure_asset_costsList cost rows for infrastructure features. Filter by feature, work order, vendor, category, or cost date range. Amounts are bare numbers with no currency: call get_organization_settings for currency_code before stating one.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "list_infrastructure_asset_costs"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| page | No | Page number (default: all pages fetched automatically) | |
| category | No | Filter by cost category | |
| per_page | No | Items per page (default: 1000, max: 1000). All pages are fetched automatically. | |
| vendor_id | No | Filter by vendor ID - resolve via list_vendors | |
| feature_id | No | Filter by infrastructure feature ID - resolve via list_infrastructure_assets | |
| cost_date_to | No | Costs on/before this date (YYYY-MM-DD) | |
| work_order_id | No | Filter by work order ID - resolve via list_work_orders | |
| cost_date_from | No | Costs on/after this date (YYYY-MM-DD) |