List asset replacement plans
list_asset_replacement_plansList asset replacement plans for lifecycle/capital planning. Filter by asset, status, priority, or planned year. Amounts are bare numbers with no currency: call get_organization_settings for currency_code before stating one.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "list_asset_replacement_plans"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| page | No | Page number (default: all pages fetched automatically) | |
| year | No | Filter by planned replacement year | |
| status | No | Filter by plan status | |
| asset_id | No | Filter by asset ID - resolve via list_assets | |
| per_page | No | Items per page (default: 1000, max: 1000). All pages are fetched automatically. | |
| priority | No | Filter by priority |