Plan a Maximo move (Upgrade Desk)
upgrade_planOne Maximo move from an earlier catalogue release to a later one (7.6.1, 8.11, 9.0, 9.1, 9.2), composed from the published record: the support clock on the source release, the staged route (IBM's n-1 policy), what IBM says about the move (route, platform, database, Java, users, add-ons, reports; each with IBM's words and page), the few items only the customer's own system can answer, break-class changes (deprecations, behaviour changes) and landmines (upgrade notes, gotchas) in range from the 9.x change log, fix and security counts, the deprecation-register rows touching the range, and the curated Change Watch entries. Every item links its record or IBM page. Same composition as assetize.com.au/upgrade//.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"from": "<from>",
"to": "<to>"
},
"name": "upgrade_plan"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| to | Yes | Target release: "8.11", "9.0", "9.1", "9.2". | |
| from | Yes | Source release: "7.6.1", "8.11", "9.0", "9.1". |