update_settings
Change planning settings. For one-off absences (a free afternoon, a doctor's appointment) don't change working hours; tell the user to add a calendar event instead.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "update_settings"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| focusEnd | No | End of the focus time, local HH:MM | |
| focusStart | No | Start of the focus time, local HH:MM | |
| focusMorning | No | Whether task work is preferably planned in the focus time (default 08:00–12:00). Only a preference: when more work is due, tasks also go to the rest of the working hours. | |
| workingHours | No | Per ISO weekday "1".."7" a list of {start, end} local HH:MM ranges; a missing or empty day is off. Replaces all days, so send the full week. | |
| personalHours | No | Personal time outside working hours, when tasks with hoursType "personal" are planned. Same shape as workingHours; replaces all days. | |
| maxLoadPercent | No | How much of each working day the plan may fill, meetings included | |
| contiguousTasks | No | Whether each task is planned as one block where it fits (default on), instead of being split to use gaps between meetings or the focus time. Only a preference: a task is still split when no free stretch is long enough, when it is longer than its maximum block length, or when keeping it whole would leave a working day empty. | |
| maxBlockMinutes | No | Longest block in one go for tasks without their own cap; null = no cap (the default), so a task may be planned in one piece. Don't set block limits if not specifically asked. | |
| overtimePercent | No | Overtime budget: share of the weekly working time (0 = off, the default; at most 50) in which tasks may also be planned in personal time, e.g. evenings, when they would not fit into working hours. Working hours are always used first, and fixed appointments stay where they are. Only change it when the user asks for it. | |
| taskDistribution | No | pack (default): tasks are planned together, and with little work days at the end of the plan may stay free. spread: every working day of the first week gets some task work, also with few tasks, by moving tasks or splitting them. In both, a task too big for the gaps of a day is split rather than leave a day empty. | |
| proposalThreshold | No | How many blocks an automatic replan may move or remove without asking; 0 = always ask | |
| meetingBufferMinutes | No |