Get project analytics
get_project_analyticsA project's current open tasks plus done and cancelled tasks created, completed, or due in the range. totalTasks and statusMix combine these; completedTasks is the done tasks in that mix. completedInRange and activitySeries cover the range. capped marks partial results. Set rangeDays (up to 90) or from and to. Needs a Pro plan.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"projectId": "<projectId>"
},
"name": "get_project_analytics"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| to | No | End of the range: epoch milliseconds or an ISO 8601 time. Default now. | |
| from | No | Start of the range: epoch milliseconds or an ISO 8601 time. Default 30 days before to. | |
| timezone | No | IANA time zone such as America/Chicago for day boundaries. | |
| projectId | Yes | Project ID or slug. | |
| rangeDays | No | Days back from now, up to 90. Use instead of from and to. |