Skip to main content
Glama

Get my task counts

get_my_task_counts
Read-onlyIdempotent

Count the open tasks assigned to the caller in this workspace. Returns assigneeId and open. Pass projectId to add attention, that project's summary: your open and overdue tasks there, the next due task, and unread mentions. assigneeId accepts only me or your own user ID.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "get_my_task_counts"
  }
}

Input Schema

NameRequiredDescriptionDefault
projectIdNoA project ID or slug from list_projects. Adds projectId and that project's attention summary to the result.
assigneeIdNoWhose tasks to count. Only your own are available: leave it out, or pass me or your user ID from check_auth.

Output Schema

NameRequiredDescriptionDefault
openYesOpen tasks assigned to you across the workspace.
attentionNoThe project's summary. Sent when projectId is passed.
projectIdNoThe project's ID. Sent when projectId is passed.
assigneeIdYesYour user ID.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A3.6/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already establish readOnly, idempotent, non-destructive behavior, so the description adds real value by disclosing the authorization constraint ('assigneeId accepts only me or your own user ID') and the extra fields that appear in the projectId mode. That scoping detail is behavior an agent could not infer from the annotations alone.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three sentences, front-loaded with the core purpose and then the optional-parameter effect. The middle sentence is somewhat compressed to the point of awkwardness ('Pass projectId to add attention, that project's summary: ...'), but no sentence is filler.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With an output schema present, the description needn't enumerate return fields, yet it does summarize what changes when projectId is supplied, which is helpful. It is adequate for a small two-parameter tool, though it leaves the relationship to the sibling count tool unresolved.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so both parameters are already documented, including the 'me or your user ID' rule. The description largely restates that and adds only the outcome of supplying projectId, which is the baseline expectation rather than added semantic depth.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The opening sentence gives a specific verb and resource ('Count the open tasks assigned to the caller in this workspace'), which is enough to distinguish it from a broad task-listing tool. It does not name or contrast with the close sibling get_project_task_counts, so the differentiation burden falls on the reader.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The description explains the two modes clearly: omit projectId for a plain count, pass projectId to additionally get that project's attention summary. However, it never states when to prefer this tool over the similarly named get_project_task_counts, nor any when-not conditions.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources