Get team workload
planitude_workloadShows how much each person on the project works per day, week or month and who is over-allocated: for each person the load as a percentage of their availability (personal calendar x max units), the tasks causing it and the date ranges above 100%. The scheduler does not level resources: an over-allocation is solved by moving or reassigning tasks, or by changing assignment units. Read-only.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"projectId": "<projectId>"
},
"name": "planitude_workload"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| to | No | Last day, YYYY-MM-DD. Default: end of assigned work. | |
| from | No | First day, YYYY-MM-DD. Default: start of assigned work. | |
| projectId | Yes | Project id (uuid), as returned by planitude_list_projects. | |
| granularity | No | Load columns: day, week (default) or month. Over-allocations are always evaluated per day. |