Remove task dependency
planitude_unlink_tasksRemoves the dependency link between two tasks and recalculates the dates; downstream tasks may move earlier and the response lists the ones that moved. It removes only the link, never a task. Requires write permission.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"projectId": "<projectId>",
"predecessor": "<predecessor>",
"successor": "<successor>"
},
"name": "planitude_unlink_tasks"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| projectId | Yes | Project id (uuid), as returned by planitude_list_projects. | |
| successor | Yes | The task that depends on the predecessor. | |
| predecessor | Yes | The task that comes first in the link. |