Set task estimate
set_task_estimateSets how long a task is expected to take, or clears it with null. Written with a unit: 4h, 1h30, 90m, 1.5h (a bare number is minutes); up to 10,000 hours. Needs the editor role on the project.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"cardId": "<cardId>",
"estimate": "<estimate>"
},
"name": "set_task_estimate"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| cardId | Yes | ||
| estimate | Yes | The estimate, e.g. 4h or 1h30; null clears it. |