Manage Periodization
manage_periodizationChange the periodization plan. action: set (plan: a policy that steers the existing routine with phases, a step ceiling and deloads; it CANNOT define exercises or sets, use save_plan for those; editing an active authored plan needs confirmed:true after the user agrees) · pause (back to the automatic engine, the policy is kept) · resume (re-activate the paused policy). Dry-run first with read_periodization(preview).
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"action": "<action>"
},
"name": "manage_periodization"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| plan | No | Policy only: no exercises or sets. Shape and rules: povver://guide/periodization. | |
| action | Yes | ||
| confirmed | No | set: true only after the user confirmed editing an active plan. |